San Marcos High School is home to more than 3000 students on this state of the art campus. It comprises 420,000 square feet and includes a 2-story performing arts center with a 400 seat theatre. The academic building along is 250,000 square feet. Brian Cox Mechanical completed this water-cooled chilled water infrastructure project on a design assist basis, and includes a frictionless chiller.
San Diego City College
This project consisted of two structures – a 128,000 square foot, five story Arts and Humanities building (including below grade parking garage), and 62,000 square foot three story Business Technology building. This was a LEED Gold project. This project had a multitude of various HVAC systems, and a variety of air delivery technology incorporated into a very tight concrete structure.