San Marcos High School

San Marcos High School is home to more than 3000 students on this state of the art campus. It comprises 420,000 square feet and includes a 2-story performing arts center with a 400 seat theatre. The academic building along is 250,000 square feet. Brian Cox Mechanical completed this water-cooled chilled water infrastructure project on a design assist basis, and includes a frictionless chiller.

San Diego City College

This project consisted of two structures – a 128,000 square foot, five story Arts and Humanities building (including below grade parking garage), and 62,000 square foot three story Business Technology building. This was a LEED Gold project. This project had a multitude of various HVAC systems, and a variety of air delivery technology incorporated into a very tight concrete structure.

Marriott Marquis

The Marriott Marquis conference space addition included new construction of approximately 270,000 square of event space over 81 separate event rooms, with the largest space accommodating over 3700 people. This project also included central plant capacity upgrades and modifications to existing infrastructure.

Big Horn

Big Horn is one of the most exclusive Country Clubs in Palm Springs, and starting in July 2016 the entire existing structure was demolished and an 80,000 square foot, extremely high-end clubhouse was completed including four luxury penthouses – in less than 16 months. Brian Cox Mechanical was selected as a team member early in the process to work on a design assist basis. This project includes multiple restaurants, an airconditioned parking garage, in addition to locker rooms and luxurious finishes throughout.